Quality control

 

 

 

 

 

 

 

 

1. Working environment forms

      1.1 Preliminary design phase:

  • Critical path;
  • New account;
  • Rules and regulations;
  • Report.

         1.2 Construction document phase:

  • Minutes;

      1.3 Construction phase:

  • Working scenario;
  • Minutes;
  • OAQ’s legal form 1F to 11F.

 

2. Working environment computer platform

       2.1 User:

  • User’s guide.

       2.2 Preliminary design phase:

  • Create drawing;
  • Autocad (preprogrammed) Data base of symbols;
  • Bank of symbols.

       2.3 Construction document phase:

  • Access to drawings;
  • Page set-up (pre-progr.);
  • Set-up printing (pre-progr.);
Print | Sitemap
© G2R architecture Inc. coréalisé avec CMCI Technologies inc.